Nexif Energy acquired a 94% equity interest in two run-of-river hydro-power projects in cascade on the Song Giang river totaling 49MW in the Khanh Hoa province of Vietnam. The two projects are the 37 MW Song Giang 2 which has been operating since December 2014 and the under construction 12 MW Song Giang 1 that is expected to be complete in early 2025.

On 20 December 2022, Nexif Energy’s interests in the Song Giang hydro-power projects were transferred to its 51% owned subsidiary, Nexif Ratch Energy